Back to Home

Our Projects

Engineering Verified.
Field Proven.

Every NAFCO facade system is engineered, tested, and installed to the same standard from independent laboratory certification to the Kingdom's most demanding landmark towers.

Engineering Verified

Independently tested before it ever reaches site

NAFCO's curtain wall systems are put through full-scale performance testing air leakage, static water penetration, and structural glazing installation witnessed and certified by independent consultants before fabrication is approved for a project.

Curtain wall test tower
Full-Scale Mock-Up

A complete curtain wall system, tested as one

A full-height mock-up tower is assembled and glazed exactly as it would be on-site then subjected to the same laboratory tests required for project certification.

Air leakage test
Air Leakage Test
Verifying airtightness under pressure
Static water penetration test
Static Water Test 720 Pa
Water penetration resistance under load
Glazing installation
Precision Glazing Installation
Vacuum-lifted panels, set to exact tolerance
Completed test tower
Fully Glazed Mock-Up
Ready for laboratory certification
Independent testing consultants on site
Independently Witnessed
Testing consultants on site throughout

Watch The Process

From crane lift to certified installation, start to finish

This walkthrough follows a full curtain wall test cycle on the mock-up tower: the vacuum-lifted crane raising each glass panel into position, the panel being seated and sealed, then the tower going through the Air Leakage Test and the Static Water Test at 720 Pa, all witnessed on site by independent testing consultants before the system is approved for a project.

Independently certified. NAFCO's facade testing program runs alongside our ISO 9001:2015 quality management certification giving consultants and clients verified performance data before installation begins. See our certificates & standards.
Landmark hospitality tower, Makkah

Makkah

Landmark Hospitality Tower

A large-scale hospitality tower rising within view of Makkah's holy precinct among the most technically demanding facade environments in the Kingdom, where precision, durability, and third-party performance certification are non-negotiable.

High-Rise Facade Curtain Wall Hospitality
Commercial tower under construction, Jeddah

Jeddah

Commercial Tower Development

A multi-story commercial tower on Jeddah's rapidly developing skyline, engineered for the coastal climate's demanding combination of heat, humidity, and salt exposure.

Commercial Tower Facade Systems Coastal Engineering
Hilti product training on site

Trusted Partners, On Site

Global partnerships that show up in the field not just on paper

NAFCO's install teams train directly with our system partners. Here, a Hilti specialist runs hands-on fastening and anchor-system training with our site crew the same partnership that supplies the anchor systems behind our facade installations.

Completed Landmarks

Proven on Saudi Arabia's most complex builds

Start a Project

Ready to put your next facade to the test?

Talk to our team